Endüstri Mühendisliği Bölümü Yayın Koleksiyonu

Permanent URI for this collectionhttps://hdl.handle.net/20.500.12416/279

Browse

Search Results

Now showing 1 - 10 of 18
  • Article
    Citation - WoS: 2
    Citation - Scopus: 2
    Naval Air Defense Planning Problem: a Novel Formulation and Heuristics
    (Wiley, 2024) Karasakal, Orhan; Kirca, Oemer; Arslan, Caner
    This article focuses on air defense in maritime environment, which involves protecting friendly naval assets from aerial threats. Specifically, we define and address the Naval Air Defense Planning (NADP) problem, which consists of maneuvering decisions of the ships and scheduling weapons and sensors to the threats in order to maximize the total expected survival probability of friendly units. The NADP problem is more realistic and applicable than previous studies, as it considers features such as sensor assignment requirements, weapon and sensor blind sectors, sequence-dependent setup times, and ship's infrared/radar signature. In this study, a mixed-integer nonlinear programming model of the NADP problem is presented and heuristic solution approaches are developed. Computational results demonstrate that these heuristic approaches are both fast and efficient in solving the NADP problem.
  • Article
    Citation - Scopus: 21
    Analysis of Barriers To the Adoption of Circular Supply Chain Management: a Case Study in the Air Conditioning Industry
    (Taylor and Francis Ltd., 2023) Çıkmak, S.; Kesici, B.
    Circular supply chain management (CSCM) is a process used to design the supply chain by recycling, remanufacturing or refurbishing, repairing, and reusing products However, no study has been encountered in the literature that analyzes CSCM barriers in the air conditioning sector. Hence, this study is aimed to investigate the barriers to CSCM adoption in the air conditioning industry. A case study was conducted on a company operating in the global air conditioning sector. Initially, literature review and expert opinions have been used to identify essential barriers. Later, 6 main barriers and 21 sub-barriers were ranked using Analytical Hierarchy Process (AHP) method based on the interval type-2 fuzzy sets. The findings indicate that “Regulatory” is the most crucial, and “Operational” is the least important main barrier. The findings of the study would be useful for practitioners and policymakers to focus on the most prominent barriers in the air conditioning supply chains. © 2023 Chinese Institute of Industrial Engineers.
  • Article
    Citation - WoS: 11
    Citation - Scopus: 10
    Ranking Using Promethee When Weights and Thresholds Are Imprecise: a Data Envelopment Analysis Approach
    (Taylor & Francis Ltd, 2022) Eryilmaz, Utkan; Karasakal, Orhan; Karasakal, Esra
    Multicriteria decision making (MCDM) provides tools for the decision makers (DM) to solve complex problems with multiple conflicting criteria. Scalarization of criteria values requires using weights for criteria. Determining weights creates controversy as they are influential on the final ranking and challenges the DM as they are hard to elicit. PROMETHEE method is widely used in MCDM for ranking the alternatives and appropriate in situations when there is limited information on the preference structure of the DM. The DM should provide exact values for parameters such as criteria weights and thresholds of preference functions. Data Envelopment Analysis (DEA) is used for measuring the relative efficiency of alternatives in a non-parametric way without requiring any weight input. In this study, we propose two novel PROMETHEE based ranking approaches that address the determination of weight and threshold values by using an approach inspired by DEA. The first approach can deal with imprecise specification of criteria weights, and the second approach can utilize both imprecise weights and thresholds. The proposed approaches provide the DM substantial flexibility on the required level of information on those parameters. An illustrative example and a real-life case study are presented to show the utility of the proposed approaches.
  • Article
    Citation - WoS: 30
    Citation - Scopus: 34
    An Auction-Based Framework for Resource Allocation in Disaster Relief
    (Emerald Group Publishing Ltd, 2011) Buyurgan, Nebil; Ertem, Mustafa Alp; Alp Ertem, Mustafa
    Purpose - The purpose of this paper is to address the inefficiency problems in procurement operations in disaster relief logistics which are mainly due to the lack of coordination among less organized suppliers and partnerships. Such problems lead to poor responsiveness and hinder timely procurement of required goods. Design/methodology/approach - An auction-based framework for procurement of goods, which is suitable for a single coordinating platform in disaster relief logistics, is proposed. Integer programming formulations are used in auctioning operations. A simulation model that generates problem instances is used to evaluate and tune system-level design parameters. Findings - Design parameters greatly affect the behaviour and responsiveness of the system and the performance of the auction-based framework in different problem instances. Combinations of those parameters may allow suppliers with limited capacities to become more involved in the bidding process. In addition, the procurement shares of bidders may change substantially with different values of the parameters. Research limitations/implications - Even though the presented framework is inspired from reallife applications, it is not implemented in real-life disaster relief operations. The goodness of fit for the framework would best be evaluated by a real disaster case. In addition, transportation scheduling and vehicle routing considerations and budgeting issues are not considered in the framework. Originality/value - This paper presents an auction-based framework for less organized suppliers of goods and their partnerships, such as local humanitarian organizations, private companies, and standby partners. The presented framework offers a background for coordination during disaster relief operations which provides opportunities to act as a set of organized entities. This background also helps those entities coordinate their efforts to enhance the capabilities of local governments and NGOs.
  • Article
    Citation - WoS: 3
    Citation - Scopus: 5
    A General Production and Financial Planning Model: Case of a Poultry Integration
    (Springer Heidelberg, 2020) Satir, Benhur; Yildirim, Gonca
    We propose a general linear programming formulation for a poultry integration to facilitate decision making in production and financial planning. The formulation is motivated by a medium-size application and by involving practitioners from the industry. It is a realistic and strategic model since we incorporate all divisions in a complex poultry integration, (including, but not limited to, feed mill, breeder coops, incubation house, broiler coops, slaughterhouse and distribution centers) as well as the interrelations among these divisions. The horizon we consider is in years, which makes the plan a strategic level plan in this fast-paced industry. Through extensive experimentation with various end-customer demand scenarios, we found out that the quantity of breeder chicks to buy at certain times during the planning horizon is the robust key decision variable in the overall system.
  • Article
    Citation - WoS: 3
    Citation - Scopus: 6
    Lot Streaming in a Two-Machine Mixed Shop
    (Springer London Ltd, 2010) Duman, Mehmet; Cetinkaya, Ferda C.
    Most classical scheduling models overlook the fact that products are often produced in job lots and assume that job lots are indivisible single entities, although an entire job lot consists of many identical items. However, splitting an entire lot (process batch) into sublots (transfer batches) to be moved to downstream machines allows the overlapping of different operations on the same product while work needs to be completed on the upstream machine. This approach is known as lot streaming in scheduling theory. In this study, the lot streaming problem of multiple jobs in a two-machine mixed shop where there are two different job types as flow shop and open shop is addressed so as to minimize the makespan. The optimal solution method is developed for the mixed shop scheduling problem in which lot streaming can improve the makespan.
  • Article
    Citation - WoS: 7
    Citation - Scopus: 9
    Compatibility Analysis of Nylon 6 and Poly(ethylene-N Acrylate-Maleic Anhydride) Elastomer Blends Using Isothermal Crystallization Kinetics
    (Elsevier Science Sa, 2010) Biber, Erkan; Gunduz, Guengoer; Mavis, Bora; Colak, Uner
    Nylon 6 is a widely used engineering polymer, and has relatively poor impact strength. Ethylene, n-Butyl acrylate, maleic anhydride (E-nBA-MAH) terpolymer is blended with Nylon 6 to enhance its impact strength. Mixture should be compatible to be used in applications. The bare interaction energy between Nylon 6 and E-nBA-MAH terpolymer is calculated according to melting point depression approach using both Flory-Huggins (FH) Theory and Sanchez-Lacombe Equation of State (SL EOS). It demonstrates that blends are thermodynamically favorable to any arrangements. Yet, isothermal crystallization kinetics and WAXS crystallization peaks of blends reveal that mixtures of various compositions have different crystallization behaviors and require alternating crystallization energy due to crystalline structures of individual polymers. Also, SEM images support that after 5% addition of elastomeric terpolymer, interaction loosens due to strong crystalline structure of Nylon 6. (C) 2010 Elsevier B.V. All rights reserved.
  • Article
    Citation - WoS: 205
    Citation - Scopus: 231
    Ammonia Removal From Anaerobically Digested Dairy Manure by Struvite Precipitation
    (Elsevier Sci Ltd, 2005) Uludag-Demirer, S; Demirer, GN; Chen, S
    Ammonia is one of the most important contaminants impairing the quality of water resources. When this is considered along with the fact that the global demand for nitrogenous fertilizers is in constant rise, the need for recovery as well as removal of nitrogen is well justified. Crystallization of N and P in the form of struvite (MgNH4PO4 center dot 6H(2)O), which is a slow releasing and valuable fertilizer, is one possible technique for this purpose. This study investigated the removal of NR4+ through struvite precipitation from the effluents of one- (R1) and two-phase (R2) anaerobic reactors digesting dairy manure. To force the formation of struvite in the anaerobic reactor effluents, Ma(2+) ion was added by using both Mg(OH)(2) and MgCl2 center dot 6H(2)O. To prevent the effect of different total phosphorus (TP) concentration in the effluents of RI and R2, as well as to not limit the formation of struvite, an excess amount Of PO43- (0.14 M) was added in the form of NaHPO4. Different stoichiometric Mg2+:NH4+:PO43- ratios were tested to determine the required Mg2+ concentrations for maximum NH4+ removal by keeping NH4+:PO43- ratio constant for the effluents of reactors RI and R2. The results revealed that very high NH4+ removal efficiencies (above 95%) were possible by adding Mg 21 ions higher than 0.06 M concentration in the effluents from reactors RI and R2. It was also observed that the initial pH adjustment to 8.50 using NaOH did not result in any significant increase in the removal of NH4+ and the removal of NH4+ in the reactors treated with MgCl2 center dot 6H(2)O was higher than those treated with Mg(OH)(2) for the same Mg2+ concentration. (c) 2005 Published by Elsevier Ltd.
  • Article
    Citation - WoS: 7
    Citation - Scopus: 10
    Bi-Objective Missile Rescheduling for a Naval Task Group With Dynamic Disruptions
    (Wiley, 2019) Karasakal, Orhan; Karasakal, Esra; Silav, Ahmet
    This paper considers the rescheduling of surface-to-air missiles (SAMs) for a naval task group (TG), where a set of SAMs have already been scheduled to intercept a set of anti-ship missiles (ASMs). In missile defense, the initial engagement schedule is developed according to the initial state of the defensive and attacking units. However, unforeseen events may arise during the engagement, creating a dynamic environment to be handled, and making the initial schedule infeasible or inefficient. In this study, the initial engagement schedule of a TG is assumed to be disrupted by the occurrence of a destroyed ASM, the breakdown of a SAM system, or an incoming new target ASM. To produce an updated schedule, a new biobjective mathematical model is formulated that maximizes the no-leaker probability value for the TG and minimizes the total deviation from the initial schedule. With the problem shown to be NP-hard, some special cases are presented that can be solved in polynomial time. We solve small size problems by the augmented epsilon-constraint method and propose heuristic procedures to generate a set of nondominated solutions for larger problems. The results are presented for different size problems and the total effectiveness of the model is evaluated.
  • Article
    Citation - WoS: 9
    Citation - Scopus: 13
    Multi-Item Two-Echelon Spare Parts Inventory Control Problem With Batch Ordering in the Central Warehouse Under Compound Poisson Demand
    (Palgrave Macmillan Ltd, 2012) Bayindir, Z. P.; Topan, E.
    We consider a multi-item two-echelon spare part inventory system in which the central warehouse operates under an (nQ, R) policy and the local warehouses implement order-up-to S policy, each facing a compound Poisson demand. The objective is to find the policy parameters minimizing expected system-wide inventory holding and fixed ordering costs subject to an aggregate mean response time constraint at each warehouse. In this paper, we propose four alternative approximations for the steady state performance of the system; and extend a heuristic and a lower bound proposed under Poisson demand assumption to the compound Poisson setting. In a computational study, we show that the performances of the approximations, the heuristic, and the lower bound are quite satisfactory; and the relative cost saving of setting an aggregate service level rather than individually for each part is quite high. Journal of the Operational Research Society (2012) 63, 1143-1152. doi: 10.1057/jors.2011.125 Published online 30 November 2011