Robust Scheduling and Robustness Measures for the Discrete Time/Cost Trade-Off Problem
| dc.contributor.author | Hazir, Oencue | |
| dc.contributor.author | Haouari, Mohamed | |
| dc.contributor.author | Erel, Erdal | |
| dc.date.accessioned | 2020-04-16T21:36:49Z | |
| dc.date.accessioned | 2025-09-18T12:05:42Z | |
| dc.date.available | 2020-04-16T21:36:49Z | |
| dc.date.available | 2025-09-18T12:05:42Z | |
| dc.date.issued | 2010 | |
| dc.description | Haouari, Mohamed/0000-0003-0767-8220; Hazir, Oncu/0000-0003-0183-8772 | en_US |
| dc.description.abstract | Projects are often subject to various sources of uncertainties that have a negative impact on activity durations and costs. Therefore, it is crucial to develop effective approaches to generate robust project schedules that are less vulnerable to disruptions caused by uncontrollable factors. In this paper, we investigate the robust discrete time/cost trade-off problem, which is a multi-mode project scheduling problem with important practical relevance. We introduce surrogate measures that aim at providing an accurate estimate of the schedule robustness. The pertinence of each proposed measure is assessed through computational experiments. Using the insights revealed by the computational study, we propose a two-stage robust scheduling algorithm. Finally, we provide evidence that the proposed approach can be extended to solve a complex robust problem with tardiness penalties and earliness revenues. (C) 2010 Elsevier B.V. All rights reserved. | en_US |
| dc.identifier.citation | Hazir, Oencue; Haouari, Mohamed; Erel, Erdal, "Robust scheduling and robustness measures for the discrete time/cost trade-off problem", European Journal of Operatıonal Research, Vol. 207, No. 2, pp. 633-643, (2010) | en_US |
| dc.identifier.doi | 10.1016/j.ejor.2010.05.046 | |
| dc.identifier.issn | 0377-2217 | |
| dc.identifier.issn | 1872-6860 | |
| dc.identifier.uri | https://doi.org/10.1016/j.ejor.2010.05.046 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.12416/10693 | |
| dc.language.iso | en | en_US |
| dc.publisher | Elsevier Science Bv | en_US |
| dc.relation.ispartof | European Journal of Operational Research | |
| dc.rights | info:eu-repo/semantics/closedAccess | en_US |
| dc.subject | Project Scheduling | en_US |
| dc.subject | Time/Cost Trade-Off | en_US |
| dc.subject | Robustness | en_US |
| dc.subject | Simulation | en_US |
| dc.title | Robust Scheduling and Robustness Measures for the Discrete Time/Cost Trade-Off Problem | en_US |
| dc.title | Robust Scheduling and Robustness Measures for the Discrete Time/Cost Trade-Off Problem | tr_TR |
| dc.type | Article | en_US |
| dspace.entity.type | Publication | |
| gdc.author.id | Haouari, Mohamed/0000-0003-0767-8220 | |
| gdc.author.id | Hazir, Oncu/0000-0003-0183-8772 | |
| gdc.author.wosid | Hazir, Oncu/C-8920-2013 | |
| gdc.author.wosid | Haouari, Mohamed/E-6786-2011 | |
| gdc.author.yokid | 4168 | |
| gdc.bip.impulseclass | C5 | |
| gdc.bip.influenceclass | C4 | |
| gdc.bip.popularityclass | C3 | |
| gdc.coar.access | metadata only access | |
| gdc.coar.type | text::journal::journal article | |
| gdc.collaboration.industrial | false | |
| gdc.description.department | Çankaya University | en_US |
| gdc.description.departmenttemp | [Hazir, Oencue] Cankaya Univ, Dept Ind Engn, TR-06530 Ankara, Turkey; [Haouari, Mohamed] Univ 7th November,Carthage, ROI, Tunisia Polytech Sch, Tunis, Tunisia; [Haouari, Mohamed] Ozyegin Univ, Dept Ind Engn, Fac Engn, Istanbul, Turkey; [Hazir, Oencue; Erel, Erdal] Bilkent Univ, Fac Business Adm, Ankara, Turkey | en_US |
| gdc.description.endpage | 643 | en_US |
| gdc.description.issue | 2 | en_US |
| gdc.description.publicationcategory | Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı | en_US |
| gdc.description.scopusquality | Q1 | |
| gdc.description.startpage | 633 | en_US |
| gdc.description.volume | 207 | en_US |
| gdc.description.woscitationindex | Science Citation Index Expanded | |
| gdc.description.wosquality | Q1 | |
| gdc.identifier.openalex | W2111525589 | |
| gdc.identifier.wos | WOS:000281107200009 | |
| gdc.index.type | WoS | |
| gdc.oaire.accesstype | BRONZE | |
| gdc.oaire.diamondjournal | false | |
| gdc.oaire.impulse | 4.0 | |
| gdc.oaire.influence | 8.620106E-9 | |
| gdc.oaire.isgreen | true | |
| gdc.oaire.keywords | Robustness measures | |
| gdc.oaire.keywords | Uncontrollable factors | |
| gdc.oaire.keywords | Sources of uncertainty | |
| gdc.oaire.keywords | Computational studies | |
| gdc.oaire.keywords | Time/cost trade-offs | |
| gdc.oaire.keywords | Multimodes | |
| gdc.oaire.keywords | Scheduling algorithms | |
| gdc.oaire.keywords | Schedule robustness | |
| gdc.oaire.keywords | Computational experiment | |
| gdc.oaire.keywords | Robustness | |
| gdc.oaire.keywords | Negative impacts | |
| gdc.oaire.keywords | Commerce | |
| gdc.oaire.keywords | 006 | |
| gdc.oaire.keywords | Project scheduling problem | |
| gdc.oaire.keywords | Time/cost trade-off | |
| gdc.oaire.keywords | Robust scheduling | |
| gdc.oaire.keywords | Project Scheduling | |
| gdc.oaire.keywords | Two stage | |
| gdc.oaire.keywords | Activity duration | |
| gdc.oaire.keywords | Time/cost Trade-off | |
| gdc.oaire.keywords | Project scheduling | |
| gdc.oaire.keywords | Tardiness penalties | |
| gdc.oaire.keywords | Project schedules | |
| gdc.oaire.keywords | Time/cost trade-off problem | |
| gdc.oaire.keywords | Simulation | |
| gdc.oaire.keywords | Deterministic scheduling theory in operations research | |
| gdc.oaire.keywords | robustness | |
| gdc.oaire.keywords | project scheduling | |
| gdc.oaire.keywords | time/cost trade-off | |
| gdc.oaire.keywords | simulation | |
| gdc.oaire.popularity | 3.540181E-8 | |
| gdc.oaire.publicfunded | false | |
| gdc.oaire.sciencefields | 0211 other engineering and technologies | |
| gdc.oaire.sciencefields | 02 engineering and technology | |
| gdc.oaire.sciencefields | 0202 electrical engineering, electronic engineering, information engineering | |
| gdc.openalex.collaboration | International | |
| gdc.openalex.fwci | 4.15193261 | |
| gdc.openalex.normalizedpercentile | 0.94 | |
| gdc.openalex.toppercent | TOP 10% | |
| gdc.opencitations.count | 101 | |
| gdc.plumx.crossrefcites | 34 | |
| gdc.plumx.mendeley | 122 | |
| gdc.plumx.scopuscites | 117 | |
| gdc.publishedmonth | 12 | |
| gdc.wos.citedcount | 102 | |
| relation.isOrgUnitOfPublication | 0b9123e4-4136-493b-9ffd-be856af2cdb1 | |
| relation.isOrgUnitOfPublication.latestForDiscovery | 0b9123e4-4136-493b-9ffd-be856af2cdb1 |
