Bilgilendirme: Kurulum ve veri kapsamındaki çalışmalar devam etmektedir. Göstereceğiniz anlayış için teşekkür ederiz.
 

Robust Scheduling and Robustness Measures for the Discrete Time/Cost Trade-Off Problem

dc.contributor.author Hazir, Oencue
dc.contributor.author Haouari, Mohamed
dc.contributor.author Erel, Erdal
dc.date.accessioned 2020-04-16T21:36:49Z
dc.date.accessioned 2025-09-18T12:05:42Z
dc.date.available 2020-04-16T21:36:49Z
dc.date.available 2025-09-18T12:05:42Z
dc.date.issued 2010
dc.description Haouari, Mohamed/0000-0003-0767-8220; Hazir, Oncu/0000-0003-0183-8772 en_US
dc.description.abstract Projects are often subject to various sources of uncertainties that have a negative impact on activity durations and costs. Therefore, it is crucial to develop effective approaches to generate robust project schedules that are less vulnerable to disruptions caused by uncontrollable factors. In this paper, we investigate the robust discrete time/cost trade-off problem, which is a multi-mode project scheduling problem with important practical relevance. We introduce surrogate measures that aim at providing an accurate estimate of the schedule robustness. The pertinence of each proposed measure is assessed through computational experiments. Using the insights revealed by the computational study, we propose a two-stage robust scheduling algorithm. Finally, we provide evidence that the proposed approach can be extended to solve a complex robust problem with tardiness penalties and earliness revenues. (C) 2010 Elsevier B.V. All rights reserved. en_US
dc.identifier.citation Hazir, Oencue; Haouari, Mohamed; Erel, Erdal, "Robust scheduling and robustness measures for the discrete time/cost trade-off problem", European Journal of Operatıonal Research, Vol. 207, No. 2, pp. 633-643, (2010) en_US
dc.identifier.doi 10.1016/j.ejor.2010.05.046
dc.identifier.issn 0377-2217
dc.identifier.issn 1872-6860
dc.identifier.uri https://doi.org/10.1016/j.ejor.2010.05.046
dc.identifier.uri https://hdl.handle.net/20.500.12416/10693
dc.language.iso en en_US
dc.publisher Elsevier Science Bv en_US
dc.relation.ispartof European Journal of Operational Research
dc.rights info:eu-repo/semantics/closedAccess en_US
dc.subject Project Scheduling en_US
dc.subject Time/Cost Trade-Off en_US
dc.subject Robustness en_US
dc.subject Simulation en_US
dc.title Robust Scheduling and Robustness Measures for the Discrete Time/Cost Trade-Off Problem en_US
dc.title Robust Scheduling and Robustness Measures for the Discrete Time/Cost Trade-Off Problem tr_TR
dc.type Article en_US
dspace.entity.type Publication
gdc.author.id Haouari, Mohamed/0000-0003-0767-8220
gdc.author.id Hazir, Oncu/0000-0003-0183-8772
gdc.author.wosid Hazir, Oncu/C-8920-2013
gdc.author.wosid Haouari, Mohamed/E-6786-2011
gdc.author.yokid 4168
gdc.bip.impulseclass C5
gdc.bip.influenceclass C4
gdc.bip.popularityclass C3
gdc.coar.access metadata only access
gdc.coar.type text::journal::journal article
gdc.collaboration.industrial false
gdc.description.department Çankaya University en_US
gdc.description.departmenttemp [Hazir, Oencue] Cankaya Univ, Dept Ind Engn, TR-06530 Ankara, Turkey; [Haouari, Mohamed] Univ 7th November,Carthage, ROI, Tunisia Polytech Sch, Tunis, Tunisia; [Haouari, Mohamed] Ozyegin Univ, Dept Ind Engn, Fac Engn, Istanbul, Turkey; [Hazir, Oencue; Erel, Erdal] Bilkent Univ, Fac Business Adm, Ankara, Turkey en_US
gdc.description.endpage 643 en_US
gdc.description.issue 2 en_US
gdc.description.publicationcategory Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı en_US
gdc.description.scopusquality Q1
gdc.description.startpage 633 en_US
gdc.description.volume 207 en_US
gdc.description.woscitationindex Science Citation Index Expanded
gdc.description.wosquality Q1
gdc.identifier.openalex W2111525589
gdc.identifier.wos WOS:000281107200009
gdc.index.type WoS
gdc.oaire.accesstype BRONZE
gdc.oaire.diamondjournal false
gdc.oaire.impulse 4.0
gdc.oaire.influence 8.620106E-9
gdc.oaire.isgreen true
gdc.oaire.keywords Robustness measures
gdc.oaire.keywords Uncontrollable factors
gdc.oaire.keywords Sources of uncertainty
gdc.oaire.keywords Computational studies
gdc.oaire.keywords Time/cost trade-offs
gdc.oaire.keywords Multimodes
gdc.oaire.keywords Scheduling algorithms
gdc.oaire.keywords Schedule robustness
gdc.oaire.keywords Computational experiment
gdc.oaire.keywords Robustness
gdc.oaire.keywords Negative impacts
gdc.oaire.keywords Commerce
gdc.oaire.keywords 006
gdc.oaire.keywords Project scheduling problem
gdc.oaire.keywords Time/cost trade-off
gdc.oaire.keywords Robust scheduling
gdc.oaire.keywords Project Scheduling
gdc.oaire.keywords Two stage
gdc.oaire.keywords Activity duration
gdc.oaire.keywords Time/cost Trade-off
gdc.oaire.keywords Project scheduling
gdc.oaire.keywords Tardiness penalties
gdc.oaire.keywords Project schedules
gdc.oaire.keywords Time/cost trade-off problem
gdc.oaire.keywords Simulation
gdc.oaire.keywords Deterministic scheduling theory in operations research
gdc.oaire.keywords robustness
gdc.oaire.keywords project scheduling
gdc.oaire.keywords time/cost trade-off
gdc.oaire.keywords simulation
gdc.oaire.popularity 3.540181E-8
gdc.oaire.publicfunded false
gdc.oaire.sciencefields 0211 other engineering and technologies
gdc.oaire.sciencefields 02 engineering and technology
gdc.oaire.sciencefields 0202 electrical engineering, electronic engineering, information engineering
gdc.openalex.collaboration International
gdc.openalex.fwci 4.15193261
gdc.openalex.normalizedpercentile 0.94
gdc.openalex.toppercent TOP 10%
gdc.opencitations.count 101
gdc.plumx.crossrefcites 34
gdc.plumx.mendeley 122
gdc.plumx.scopuscites 117
gdc.publishedmonth 12
gdc.wos.citedcount 102
relation.isOrgUnitOfPublication 0b9123e4-4136-493b-9ffd-be856af2cdb1
relation.isOrgUnitOfPublication.latestForDiscovery 0b9123e4-4136-493b-9ffd-be856af2cdb1

Files